The 3.5 MW power plant has been implemented by joint investment between Maxsun and a German investor. One of the fundamental and essential solutions adapting to climate changes, especially in the provinces that are affected by drought and dehydration challenges is the construction of renewable power plants like the solar system, which in addition to preventing the use of fossil fuels and the emission of air pollutants, does not require water consumption in electricity generation. It created jobs for 60 and 10 indigenous people during the construction and operation periods, respectively.

Leave a Reply

Your email address will not be published. Required fields are marked *